adaptation_solution_score
579 rows where Score = 4
This data as json, CSV (advanced)
Suggested facets: Domain, Criteria, Variable
| Link | rowid ▼ | ID | Domain | Criteria | Variable | Rational_for_the_Platform | Score |
|---|---|---|---|---|---|---|---|
| 2 | 2 | 1 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 3 | 3 | 1 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 4 | 4 | 1 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 6 | 6 | 1 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 8 | 8 | 1 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 9 | 9 | 1 | Contribution to adaptation goal & co-benefits | Relevance | Legitimacy | All three types of adaptation pathways are proposed (coping, adaptative, transformative) | 4 |
| 12 | 12 | 1 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 13 | 13 | 1 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 14 | 14 | 1 | Scalability & Replicability | Efficiency | Efficiency for replicability | The project's adaptation measures were tailored to available of local resources | 4 |
| 15 | 15 | 1 | Scalability & Replicability | Efficiency | Investment cost | The costs of the project were shared by public/private and local stakeholders | 4 |
| 17 | 17 | 1 | Scalability & Replicability | Legitimacy | Participatory Processes | Local stakeholders participated in design, planning and implementation processes of the project | 4 |
| 20 | 20 | 2 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 25 | 25 | 2 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 27 | 27 | 2 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 29 | 29 | 2 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 30 | 30 | 2 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 37 | 37 | 3 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 38 | 38 | 3 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 42 | 42 | 3 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 44 | 44 | 3 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 46 | 46 | 3 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 47 | 47 | 3 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 51 | 51 | 3 | Scalability & Replicability | Legitimacy | Participatory Processes | Local stakeholders participated in design, planning and implementation processes of the project | 4 |
| 53 | 53 | 4 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 55 | 55 | 4 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 59 | 59 | 4 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 61 | 61 | 4 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 64 | 64 | 4 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 76 | 76 | 5 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 78 | 78 | 5 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 80 | 80 | 5 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 81 | 81 | 5 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 88 | 88 | 6 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 90 | 90 | 6 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Business Opportunities | Income diversification of the local community is a target of the project | 4 |
| 91 | 91 | 6 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 92 | 92 | 6 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Mitigation synergies | Positive synergies between adaptation and mitigation is/was a main target of the project | 4 |
| 93 | 93 | 6 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 95 | 95 | 6 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 97 | 97 | 6 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 98 | 98 | 6 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 104 | 104 | 7 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 105 | 105 | 7 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 108 | 108 | 7 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 110 | 110 | 7 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 114 | 114 | 7 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 115 | 115 | 7 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 119 | 119 | 7 | Scalability & Replicability | Legitimacy | Participatory Processes | Local stakeholders participated in design, planning and implementation processes of the project | 4 |
| 122 | 122 | 8 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 123 | 123 | 8 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 127 | 127 | 8 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 131 | 131 | 8 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 132 | 132 | 8 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 137 | 137 | 9 | Contribution to adaptation goal & co-benefits | Effectiveness | Monitoring & Evaluation | Impact assessment planned or in place | 4 |
| 138 | 138 | 9 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 142 | 142 | 9 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 144 | 144 | 9 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 148 | 148 | 9 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 154 | 154 | 10 | Contribution to adaptation goal & co-benefits | Effectiveness | Monitoring & Evaluation | Impact assessment planned or in place | 4 |
| 155 | 155 | 10 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 156 | 156 | 10 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 165 | 165 | 10 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 166 | 166 | 10 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 170 | 170 | 10 | Scalability & Replicability | Legitimacy | Participatory Processes | Local stakeholders participated in design, planning and implementation processes of the project | 4 |
| 173 | 173 | 11 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 178 | 178 | 11 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 183 | 183 | 11 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 189 | 189 | 12 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 190 | 190 | 12 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 191 | 191 | 12 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 199 | 199 | 12 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 200 | 200 | 12 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 203 | 203 | 12 | Scalability & Replicability | Sustainability | Sustainability | The project integrates institutions, creates business opportunities and incorporates finance measures with a clear exit strategy | 4 |
| 207 | 207 | 13 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 210 | 210 | 13 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 212 | 212 | 13 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 216 | 216 | 13 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 217 | 217 | 13 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 223 | 223 | 14 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 227 | 227 | 14 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Environmental Co-benefits | The project provided three or more additional environmental co-benefits to the main adaptation goal | 4 |
| 229 | 229 | 14 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 233 | 233 | 14 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 234 | 234 | 14 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 237 | 237 | 14 | Scalability & Replicability | Sustainability | Sustainability | The project integrates institutions, creates business opportunities and incorporates finance measures with a clear exit strategy | 4 |
| 240 | 240 | 15 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 241 | 241 | 15 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 249 | 249 | 15 | Scalability & Replicability | Easiness for Implementation | Institutional Capacity within the expected time-frame | Capacities to implement the project were already available | 4 |
| 250 | 250 | 15 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
| 251 | 251 | 15 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 255 | 255 | 15 | Scalability & Replicability | Legitimacy | Participatory Processes | Local stakeholders participated in design, planning and implementation processes of the project | 4 |
| 258 | 258 | 16 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 263 | 263 | 16 | Contribution to adaptation goal & co-benefits | Environmental Co-benefits | Externalities | Negative impacts assessed but not found or negligible | 4 |
| 268 | 268 | 16 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 275 | 275 | 17 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 285 | 285 | 17 | Scalability & Replicability | Coherence | Development Strategies: Contribution to International development goals/strategies (E.g SDGs, Sendai Framework, NDCs, NAPs) | The project's adaptation goals are/were aligned to (three) of the nation's international commitments and agendas | 4 |
| 288 | 288 | 17 | Scalability & Replicability | Sustainability | Sustainability | The project integrates institutions, creates business opportunities and incorporates finance measures with a clear exit strategy | 4 |
| 291 | 291 | 18 | Contribution to adaptation goal & co-benefits | Impact | Efficacy contributing to adaptation goals | Vulnerabilities assessed using sub-national evidence | 4 |
| 292 | 292 | 18 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Social Co-benefits | The project provided three or more additional social co-benefits to the main adaptation goal | 4 |
| 293 | 293 | 18 | Contribution to adaptation goal & co-benefits | Social Co-benefits | Equity | The project targeted a disdavantaged group (defined geographically and socio-economically) and addressed inequalities | 4 |
| 299 | 299 | 18 | Contribution to adaptation goal & co-benefits | Relevance | Implementation time-frame | The benefits of the project will be perceived in the short-term (months) | 4 |
| 301 | 301 | 18 | Scalability & Replicability | Coherence | Development Strategies: Contribution to national development goals/strategies | The project's adaptation goals are/were aligned to a national development strategy across multiple sectors | 4 |
Advanced export
JSON shape: default, array, newline-delimited
CREATE TABLE "adaptation_solution_score" ( "ID" VARCHAR(255) NULL, "Domain" VARCHAR(255) NULL, "Criteria" VARCHAR(255) NULL, "Variable" VARCHAR(255) NULL, "Rational_for_the_Platform" VARCHAR(255) NULL, "Score" VARCHAR(255) NULL );